Client

Barry Callebaut

Project

Trane Chiller Installation

Project

A world leading manufacturer of high quality chocolate and cocoa products needed a replacement chiller for their old Trane chiller which had been operating for more than a decade. They needed a chiller to provide chiller water for both comfort cooling purposes and also for process cooling. Atlantic Climate Control installed two Trane RTAC 300 air cooled chillers. These systems were chosen o the basis of their reliablity and life cycle costs.